EN
CN
Mobile

Capacity per day: 3-5t/d per set

Installed Capacity: 22kW per set

Power Consumption: 10 kilowatt-hour per hour per set

Standard Configuration: Mechanical feed and conveying system, pyrolysis gasification absorption system, air supply system, gas supply system, start-up system, cooling circulation system, automatic ash extraction system, flue gas deep purification system, automatic control system, vehicle-mounted power generation system, vehicle

Optional Configuration: Cloud data transmission system, fly ash solidification device, fuel adding and conveying device, portable equipment maintenance tools.

Modular design, small occupation of area

No auxiliary fuel, save processing cost

Dry purification method, no sewage generated

High automation, low labor intensity

Cloud management platform, data remote transmission

Movable, no fixed station, flexible use, large radiation area, reduce equipment investment.

Villages and pastures   Tourist attraction    Port and island    Oilfields and mine    Airport and highway service areas    Barracks and military ports    Emergency and disaster relief    Customs Quarantine area   Industrial parks