In November 2022, our company was awarded the Dual Medium Filter Skids for the Iraq Block 9 Crude Oil Central Processing Facility Project, comprising 2 skids with a total of 5 equipment units. This project marks China CAMC Engineering's first overseas oilfield surface engineering venture and currently stands as Iraq's largest-scale oil and gas construction project. As our inaugural collaboration with China CAMC Engineering, the 2 sets of Dual Medium Filter Skid serve as critical components and key equipment within the Circulating Cooling Water System. The end clients - Iraq's Basra Oil Company and Kuwait Energy Basra Limited - maintained exceptionally stringent requirements. Accordingly, we prioritized project execution with utmost diligence, rigorously controlling both quality standards and project timelines while maintaining constant, effective communication with China CAMC Engineering throughout the process.
In July 2023, the company coordinated a comprehensive Factory Acceptance Test (FAT) with Chinese CAMCE representative, third-party inspector SGS, and client-appointed auditor TÜVR. The equipment successfully passed all acceptance procedures and was delivered to the designated project port as scheduled after packaging.
In April 2024, the 2 sets of Dual Medium Filter Skid were successfully installed and commissioned on-site. Our company's exceptional product quality and full-cycle technical services earned a special letter of appreciation from China CAMCE, which particularly commended our comprehensive support during project execution and commissioning phases. This project has laid a solid foundation for future collaboration between both parties.